Project and delivery

Developed by Shenyang Weike, this automated Φ10 m VPI system serves whole-insulation impregnation for the Fuqing Xinghua Bay 10 MW direct-drive offshore wind generator. It was installed and put into production at the Fujian Three Gorges Offshore Wind Power International Industrial Park. The complete system integrates the vessel structure, closure movement, handling, heating and automated controls required for large-diameter stators.

Key developments include a large sliding quick-opening closure with safety interlocks, automated process control with parameter optimisation and fault diagnosis, and medium-frequency electromagnetic heating. Weike coordinated fabrication, transport, site assembly and commissioning to bring the large direct-drive stator insulation process into production.

On 2 November 2020, an expert evaluation organised by Zhongke Hechuang (Beijing) identified the system as the first automated 10-metre-diameter VPI system in China and internationally. The evaluation concluded that it addressed a gap in large direct-drive wind-power manufacturing and achieved an internationally advanced overall level. Evaluation reference: Zhongke Evaluation [2020] No. 4633.

The equipment entered Liaoning’s 2020 first-unit major technical equipment list. Extra-large VPI equipment received third prize in the 2021 Liaoning Science and Technology Progress Awards. The 10-metre system marks a major step in Weike’s continuing wind-power equipment development; later applications have expanded to manufacturing of wind generators rated above 20 MW.